|
|
|
|
|
|
All
CTS (Man Safety Cages) are manufactured at our Head office in Gateshead
where the appropriate man and machine power is available. We currently
manufacture 20 foot and 40 foot
variants and also 20 foot and 40 foot combination units for all port
authorities around the world. Each cage manufactured comes complete with
CE, SWL (Safe Working Load) and other appropriate certification visibly
stamped to the cage and certificates supplied. |
|
|
MWL (Max Working Load)
20’ = 5T
Men and Equipment MWL (Max Working Load) 40’ = 7.5T Men and Equipment |
![]() |